Memorial Pavilion – Building progress
Week 38. 3rd – 7th Nov 2014
10th Nov 2014
The final coat of the chosen colour has been applied to the walls in the Main Hall
10th Nov 2014
The final coat of the chosen colour has been applied to the walls in the Main Hall
10th Nov 2014
The cabinets are being installed in the Kitchen
10th Nov 2014
The cabinets are being installed in the Kitchen
10th Nov 2014
The cabinets are being installed in the Kitchen
10th Nov 2014
The worktops have been installed on the cabinets in the Kitchen. Note also the cooker hood has been installed but awaits its chimney pipe and electrical connection
10th Nov 2014
The doors have been fitted to the wall cabinets. Note also the cooker hood has been completed and is working
10th Nov 2014
The doors have been fitted to the wall cabinets. Note also the cooker hood has been completed and is working
10th Nov 2014
A start has been made on laying the Oak plank design vinyl flooring in the Main Hall and the Meeting Room
11th Nov 2014
The restored Triptych panel has been hung on the lobby wall facing the entrance door window
11th Nov 2014
The safety fence, to stop people falling onto the Bowls green is being erected
11th Nov 2014
The safety fence, to stop people falling onto the Bowls green has been completed
11th Nov 2014
The grass is still growing on the overflow car park area
12th Nov 2014
The doors and drawer fronts have been fitted to some of the base cabinets
12th Nov 2014
The doors and drawer fronts have been fitted to some of the base cabinets
12th Nov 2014
The vinyl flooring in the Main Hall and Meeting room is nearing completion
12th Nov 2014
The vinyl flooring in the Main Hall and Meeting room is nearing completion
13th Nov 2014
The vinyl flooring in the Main Hall has now been completed
13th Nov 2014
The vinyl flooring in the Meeting room has now been completed
13th Nov 2014
Changing room 1 has now been completed
13th Nov 2014
Changing room 2 has now been completed
13th Nov 2014
Anglian Water has installed the mains water pipe across the road and has connected it to the building, so we now have our own mains water
13th Nov 2014
The new cooker, fridge and microwave have arrived. The cooker will be connected next week
13th Nov 2014
Preparations for the laying of the vinyl flooring are being undertaken in the Lobby