Memorial Pavilion – Building progress
Week 25. 11th – 15th Aug 2014
11th Aug 2014
Changing room 1 has had all the plasterboard fitted to be ready for the coat of plaster
11th Aug 2014
The disabled parking area hardcore is being laid down on top of the ground covering and net to be ready for the brick paving to be laid
11th Aug 2014
The shrub garden has been walled ready for the brick paving to be laid around it
12th Aug 2014
The disabled parking area groundwork continues with rolling the infill flat ready for the brick paving to be laid
12th Aug 2014
The East wall plasterboard has been finished ready for the coat of plaster
12th Aug 2014
The South West corner is having the paving slabs laid. Notice that the two spectator canopies have had the guttering and downpipes installed but they still wait for the roofing to be fixed on
12th Aug 2014
The paving slabs at the South East end have had the joints grouted
13th Aug 2014
The lobby walls are being covered in plasterboard to be ready for a coat of plaster
13th Aug 2014
The Metposts have been driven into the ground ready for the wooden posts and rails to be fitted
13th Aug 2014
The first section of Knee fence has been completed
13th Aug 2014
The paving slabs at the South West corner have been laid and the joints grouted. Note the Metpost positioned ready for the post and rails to be fitted for that section of Knee fence
14th Aug 2014
Work continues on laying the brick paving in front of the the East wall. This area is where the four bicycle racks will be erected
14th Aug 2014
Work continues on laying the brick paving in front of the the East wall. Note three of four granite blocks, which are the old corner stones from the War Memorial saved when they were renewed, very fitting to be placed next to the Memorial Pavilion! They will prevent cars driving too far forward when parking in the disable parking bays
14th Aug 2014
Work continues on laying the brick paving in front of the East wall. The fourth granite stone is laying on the pallet waiting to be erected when they get to paving that area
15th Aug 2014
Work continues on laying the brick paving in front of the East wall
15th Aug 2014
Notice how well the granite stones fit into the brick paving in front of the East wall
15th Aug 2014
The Lobby walls continue to have the plasterboard fitted on
15th Aug 2014
The window frame has been fitted in the East wall main window but it now awaits the glass