Memorial Pavilion – Building progress
Week 11. 6th – 10th May
10th May 2014
Store room through the East wall window
10th May 2014
Kitchen showing the two serving hatch apertures, furthest one into the main hall and the nearest one into the lobby
10th May 2014
View showing the doorways into the main hall on the left and the meeting room on the right. Note the roller shutter support pillar in the main hall
10th May 2014
View showing the corridor from the lobby to the South exit door. Note the curved wall with the toilet doorways
10th May 2014
View showing inside the Ladies toilet
10th May 2014
View showing inside the Gents toilet
10th May 2014
View showing inside the Disabled toilet
10th May 2014
View showing the Referee’s changing room
10th May 2014
View showing one of the two shower rooms